Observatory - Construction
Groundbreaking for The Stars at
Night Observatory took place on March 4, 2010.
The location was roughly staked off on February 27th:
Concrete poured for observing deck on March 4th:


Forms ready for concrete footings:
Kit for building under construction:
Far end of building has a built-in 8' work area/desk and storage loft, and shelves on both sides (not built yet in this photo).

Roof is now on:

Shingles are on the roof and windows installed.

Storage loft above desk on north wall:

Shelves on east and west walls:

Work area/desk on north wall:

Electrical work started; switches for exterior lights, interior white light and interior red lights:

Skirt finished around bottom of building; exterior lights installed; first coat of white paint applied (trim will be dark green):

Exterior four-plug outlet:

Painting is finished:

Trench for electrical:

Davis weather station:

Interior of observatory:

Telescopes and accessories cabinet:

Telescope rolled out:

Observatory wall plaque:

|